MeloBids · Solutions

What a Takeoff Is For.

A commercial plan set in, a reviewed, marked-up quantity takeoff out — and each of the jobs an estimator does with it, on its own row.

01 · Painting

Wall Area, Net of the Openings That Count.

Paintable wall square feet per room from the plan's geometry and the ceiling height, with openings deducted per opening once they pass the threshold — a door doesn't deduct, a storefront does. Every number is a mark on the sheet you can point to.

  • Net wall SF per room, ceiling height resolved
  • Openings deducted per opening, over 100 SF
  • A mark on the sheet behind every quantity
02 · Addenda

The Addendum, as a Diff.

A new version of the set is a new version of the takeoff, and the Revisions page compares any two by sheet and work item, priced — the exhibit for a change order, not an afternoon of re-measuring.

  • A published takeoff is locked; the addendum is a new version
  • Added, removed and changed, line by line, priced
  • CSV out; 'Send as change order' from the same page
03 · Flooring

Floor Area by Room, Off the Schedule.

The finish schedule and the room schedule are read as tables and checked against the plan's geometry, so each room's floor area carries the finish the schedule gives it — with the source sheet on every line.

  • Schedules read exactly, cells validated
  • Floor area per room from the geometry
  • Finish per room from the schedule
04 · Proof

The Marked Set, on Paper.

Export the drawing with every mark drawn on it and a legend — the proof a reviewer, a GC or your own future self can check a quantity against. A number the engine cannot draw goes to the review queue, never into the takeoff.

  • Every quantity drawn on its sheet
  • A legend per condition
  • Nothing unplaced ever reaches the totals
05 · Trim

Perimeter Minus the Doors.

Base linear feet per room is the room's perimeter less its door openings, from the same geometry that gave the floor area — so base, floor and wall never disagree about a room.

  • Base LF per room
  • Door openings taken out
  • One evaluator for every formula
06 · Pricing

Your Rates on the Reviewed Quantities.

One click turns the reviewed takeoff into a draft quote at your own unit rates, with the selected sub quotes as lump sums and your overhead & profit last. Waste is applied at pricing, never to a quantity. A missing rate prices at $0 and says so — unless you accept MeloAI's labelled estimate for it, which your rate replaces the moment you set one.

  • Your rate table, your assemblies, your O&P
  • The quote remembers the takeoff version it came from
  • A missing rate is $0, flagged — or a labelled estimate you accepted
07 · Subcontractors

The Sub's Number, Beside Yours.

Record the quotes subcontractors give you — no email, ever — compare them by scope and select one per scope. The selected quote prices as a lump sum beside the takeoff's own work, with overhead and profit over both, and shows in Reports and on the takeoff document.

  • Recorded by you, never requested by mail
  • One selected quote per scope
  • A sub line is never a takeoff line
08 · After award

The Change, Priced From the Diff.

A scope change after award is priced between two locked versions by the same diff that prices an addendum. 'Send as change order' makes the MeloDocs document, and the change order's status — sent, approved — is read from that document.

  • Both versions locked
  • Net and marked-up totals from the diff
  • Status from the document it became

Stake a Bid
On It

Upload a plan set and see what comes back marked — then check it against a takeoff you already did by hand.